AQW 46848/22-27 Written question to the Minister for Infrastructure

To ask the Minister for Infrastructure to detail when the green cycle boxes, across North Belfast, will be repainted.

Asked by Nuala McAllister MLA on 21 May 2026

  • Answered
  • Written
Tabled
21 May 2026
Answer due by
8 June 2026
Answered
4 June 202614 days after tabling
Department
Department for Infrastructure
Priority question
No

Answer

Road markings serve a very important function in conveying information and requirements about the road network and poorly maintained road markings can have a negative impact on road safety. With this in mind, my officials undertake regular routine maintenance inspections of all roads during which all defects, including defective signs and road markings, are noted.

Road markings are not replaced within a routine/specific time frame, rather whenever a proportion of the marked area is found to be ineffective or worn away. Where the condition of road markings falls below the required standards, they are renewed as soon as possible within the available funding limits.

Officials are currently considering a schedule of works that will include green cycle boxes which require refreshment. Works to refresh the road markings identified as part of this schedule will commence in June 2026.

Official sources